Materials were carefully selected to match this 3-bay brick-clad building to the main school.
With the buff-coloured bricks slips and contrasting header course, it would be hard to tell that this building was not of traditional masonry-built construction.
Doors and windows are green powder-coated aluminium.
Internally, the toilet cisterns are concealed behind Venesta’s panelling system.
Our role in this contract included the demolition of an existing modular building in the same location and construction of bespoke foundations to take account of the bank that the building sits on.
Click images to enlarge